Subscribe to Job Alert
Join our happy subscribers
Specific Objectives
Scope of the Work
Hydrogeological report including
Environmental Impact Assessments including
Roles and responsibilities
Consulting firm should:
ACF will:
Time frame
Application procedures
The Consultant is required tprovide the following
Check how your CV aligns with this job
Qualified contractors are invited to submit their valid documents as stated above, submitted as PDF document stamped with the company’s logo/letter head and current postal address on each of the page submitted and received on or before Tuesday, 30th January 2024 at 1700 hours to the following email address: [email protected]
Please quote Hydrogeological/Geophysical Survey, EIA, Drilling Supervision, Design of Water Abstraction and Reticulation System in Isiolo County as the email subject line
Build your CV for free. Download in different templates.
Join our happy subscribers